qtest/migration-tests.c: use "-incoming defer" for postcopy tests
The Postcopy preempt capability is expected to be set before incoming starts, so change the postcopy tests to start with deferred incoming and call migrate-incoming after the cap has been set. Why the existing tests (without this patch) didn't fail? There could be two reasons: 1) "backlog" specifies the number of pending connections. As long as the server accepts the connections faster than the clients side connecting, connection will succeed. For the preempt test, it uses only 2 channels, so very likely to not have pending connections. 2) per my tests (on kernel 6.2), the number of pending connections allowed is actually "backlog + 1", which is 2 in this case. That said, the implementation of socket_start_incoming_migration_internal expects "migrate defer" to be used, and for safety, change the test to work with the expected usage. Signed-off-by:Wei Wang <wei.w.wang@intel.com> Reviewed-by:
Peter Xu <peterx@redhat.com> Reviewed-by:
Juan Quintela <quintela@redhat.com> Message-ID: <20230606101910.20456-3-wei.w.wang@intel.com> Signed-off-by:
Juan Quintela <quintela@redhat.com>
Loading
Please register or sign in to comment