-
Alex Bennée authored
At least for check-tcg we can split the build phase from the test phase and do the former in parallel. While we are at it drop the V=1 for the check-tcg part as it just generates a lot more noise in the logs. Signed-off-by:
Alex Bennée <alex.bennee@linaro.org>
Reviewed-by:
Philippe Mathieu-Daudé <philmd@redhat.com>
Tested-by:
Philippe Mathieu-Daudé <philmd@redhat.com>
Message-Id: <20200203090932.19147-15-alex.bennee@linaro.org>Alex Bennée authoredAt least for check-tcg we can split the build phase from the test phase and do the former in parallel. While we are at it drop the V=1 for the check-tcg part as it just generates a lot more noise in the logs. Signed-off-by:
Alex Bennée <alex.bennee@linaro.org>
Reviewed-by:
Philippe Mathieu-Daudé <philmd@redhat.com>
Tested-by:
Philippe Mathieu-Daudé <philmd@redhat.com>
Message-Id: <20200203090932.19147-15-alex.bennee@linaro.org>
Loading